On a commercial build you deal with me directly. I visit every site myself to look at the space, the electrics and the ventilation before anything is designed.
The first questions are about how your business runs. When are you busiest? When is it quiet? Where do guests or members walk? Is there an off-season? The answers decide when and how we build.
From there we do the design and drawings, order materials and plan the install. This stage takes a few weeks, and none of it happens at your site. On a standalone build, we act as main contractor ourselves, with our own team of sauna builders and carpenters, and I'm on site for every job.
If you're building new premises, or your business is going through a wider renovation, I'd always say that's the best time to add a sauna. We draw up the sauna plans and work directly with your architect and main contractor, so the sauna is planned into the project from day one.
Power, ventilation and the room itself can all be planned around it while the work is already happening. That saves time and rework later.
Prebuilt saunas are for outdoor spaces. Indoors, we build a custom sauna from the ground up, and we build custom saunas outdoors too.
A prebuilt sauna is built at our Dublin facility and arrives finished. We crane-lift it off the truck into position, connect it and hand it over. It's the quickest way to add a sauna outdoors with the least disruption. A prebuilt install usually takes 2 to 3 days on site, or a little longer if we need to prepare a base first.
A custom sauna is designed around your space and built in place, so there's far more room to customise it. It takes longer on site, and it can go almost anywhere.
Either way, every sauna can be wood-fired or electric.

If you're building new premises, or your business is going through a wider renovation, I'd always say that's the best time to add a sauna. We draw up the sauna plans and work directly with your architect and main contractor, so the sauna is planned into the project from day one.
Power, ventilation and the room itself can all be planned around it while the work is already happening. That saves time and rework later.
Any work on site is planned around your trading, and we organise all of it.
Outdoor builds cause very little disruption. We block off the area we're working in, and the rest of your grounds stay open as normal.
Indoors, we section off the part of the building we're working in and keep it closed until we're finished.
On crane lift day, we book the crane and handle the lift. The only thing we ask of you is to block off the area if it's somewhere with a lot of foot traffic, for health and safety.
The off-season is always the easiest time to build, but you don't have to wait for it. Where there's no way to avoid some disruption, I speed the job up. I bring in extra people and work through it in the shortest time we can, because the goal is keeping your business running.
Throughout the job you deal with one team. We coordinate with your staff and any contractors on site, so nobody on your side ends up managing trades.


Pretty much anywhere. It doesn't need an unusual space. A few examples:
If you run a gym, a hotel, sports club, or a spa for example, we can plan and build a full sauna room for you, from putting up the walls to the changing area. Saunas are what we do, but if you come to us with the whole room, we'll sort it out, including the proper ventilation every sauna needs, and bring in any other contractors the job needs.
Indoor builds take slightly longer on site, since we're working inside the building.
Every electric sauna needs its own power supply, certified by an electrician. We arrange the electrician to survey your site early on. That includes prebuilt saunas. A lot of commercial buildings can already take a larger heater, but the survey is mandatory, because some older supplies can only handle a smaller one. If that's the case, we size the heater to suit.
Indoor saunas also need proper ventilation. We design and fit it, so it's dealt with as part of the build.
Indoor saunas built into an existing building generally don't need planning permission, as they count as interior works. Outdoor commercial saunas usually do. The garden exemptions that let homeowners build without permission don't apply to business premises, and that includes a prebuilt sauna lifted into place.
If your building is a protected structure, most works need permission, inside or out. Hotels and some other commercial buildings may also need a fire safety certificate and a disability access certificate for the works.
We always check the planning rules before we build an outdoor sauna, and we still check for indoor ones. We advise you on what your site needs and supply the drawings and necessary paperwork on our end for any application.
A custom sauna takes around 10 weeks from first call to handover. A prebuilt takes 5 to 6 weeks. Most of that is drawings, ordering materials and building, none of which happens at your site.
Building into an existing room takes a little longer. We always aim to finish as quickly as possible.

Before we leave, we show your staff how to use the sauna and run the heater. Electric heaters run from a wall-mounted control panel, inside or outside the sauna, and some can be managed from a phone app. Staff control the heat, so guests don't need to touch the heater at all. Where it's needed, we fit a guard rail around the heater or fence it off completely. Wood-fired heaters need more hands-on upkeep, and we take your team through what that involves.
Our support carries on after handover. If a heater breaks, we come out and fix it. That's part of what we do, and it's a big part of what sets us apart. With most companies you order a unit and sort everything else out yourself. We handle the lot, from the first site visit to any repairs down the line.